MISO request J1375

MISO queue ID J1375

Queue request J1375 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW solar project in Muskegon County, MI, according to Berkeley Lab’s queue data file. The filing names Du Pont - Cobb -White Lake as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 12, 2025.

Queue IDJ1375
Project nameNot reported
Status (as published)Active
SubstationDu Pont - Cobb -White Lake
Point of interconnectionDu Pont - Cobb -White Lake 138kv
CountyMuskegon
StateMI
Voltage138 kV
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-05-12
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Muskegon, MI: 14 requests in the MISO queue, 7 active totaling 949.7 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2019 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA Complete; Post GIA Status: Under Construction
Queue date2019-04-29
Interconnection agreement date2022-08-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.