Substation Scout

Muscatine, IA interconnection queue

6 active projects totaling 585.4 MW in the MISO queue, plus 1 with terminal status (shown grayed).

6active projects
585.4active MW
7total filed
Queue IDProjectkVMWResourceStatus
G187 Not reported n/r 600 Other Withdrawn
J1218 Not reported 345 200 Solar Active
J3461 Not reported 161 156 Solar Active
J2686 Not reported 345 150 Wind Active
J1229 Not reported 345 50 Battery Active
J1927 Not reported 69 23.4 Solar Active
G355 Not reported 69 6 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first