Murray, MN interconnection queue
12 active projects totaling 1,141 MW in the MISO queue, plus 19 with terminal status (shown grayed).
12active projects
1,141active MW
31total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G850 | Not reported | n/r | 250 | Wind | Withdrawn |
| G851 | Not reported | 115 | 250 | Wind | Withdrawn |
| J2104 | Not reported | 345 | 230 | Wind | Active |
| G163 | Not reported | n/r | 200 | Wind | Withdrawn |
| G183 | Not reported | n/r | 200 | Wind | Withdrawn |
| J2346 | Not reported | 345 | 200 | Wind | Active |
| J2447 | Not reported | 345 | 200 | Wind | Active |
| J725 | Not reported | 345 | 200 | Wind | Withdrawn |
| G879 | Not reported | 115 | 150 | Wind | Withdrawn |
| J874 | Not reported | 115 | 150 | Solar | Active |
| G060 | Not reported | n/r | 100 | Wind | Operational |
| J2309 | Not reported | 115 | 100 | Solar | Active |
| G057 | Not reported | n/r | 80 | Wind | Operational |
| J1212 | Not reported | 115 | 60 | Solar | Withdrawn |
| G831 | Not reported | 115 | 50 | Wind | Withdrawn |
| J1498 | Not reported | 115 | 50 | Battery | Withdrawn |
| J525 | Not reported | 69 | 50 | Solar | Withdrawn |
| G037 | Not reported | n/r | 36 | Wind | Operational |
| G688 | Not reported | n/r | 24 | Wind | Withdrawn |
| G130 | Not reported | n/r | 22 | Other | Withdrawn |
| J1045 | Not reported | 115 | 20 | Battery | Active |
| J303 | Not reported | 69 | 20 | Solar | Withdrawn |
| J1037 | Not reported | 69 | 15 | Battery | Withdrawn |
| G233 | Not reported | n/r | 10 | Wind | Withdrawn |
| G252 | Not reported | 69 | 10 | Wind | Operational |
| G272 | Not reported | 69 | 10 | Wind | Operational |
| G373 | Not reported | n/r | 9.9 | Other | Withdrawn |
| G492 | Not reported | n/r | 5 | Wind | Operational |
| G097 | Not reported | n/r | 2 | Wind | Withdrawn |
| G123 | Not reported | n/r | 2 | Other | Withdrawn |
| G124 | Not reported | n/r | 1 | Other | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.