Queue request G492 was listed in the MISO interconnection queue at the end of 2025 as a 5 MW wind project in Murray County, MN, according to Berkeley Lab’s queue data file. The filing names Southridge Substation - SRD 211 as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2005.
| Queue ID | G492 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Southridge Substation - SRD 211 |
| Point of interconnection | Southridge Substation - SRD 211 |
| County | Murray |
| State | MN |
| Voltage | Not reported |
| Capacity | 5 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2005-12-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Murray, MN: 31 requests in the MISO queue, 12 active totaling 1,141 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Project type | Generation |
|---|---|
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Queue date | 2005-02-04 |
| Interconnection agreement date | 2005-06-06 |
| Operational date | 2005-12-01 |