Substation Scout

MISO request G252

MISO queue ID G252

Queue request G252 was listed in the MISO interconnection queue at the end of 2025 as a 10 MW wind project in Murray County, MN, according to Berkeley Lab’s queue data file. The filing names GRE Rock River - Chandler Tap as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 1, 2005.

Queue IDG252
Project nameNot reported
Status (as published)Operational
SubstationGRE Rock River - Chandler Tap
Point of interconnectionGRE Rock River - Chandler Tap 69 kV
CountyMurray
StateMN
Voltage69 kV
Capacity10 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2005-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Murray, MN: 31 requests in the MISO queue, 12 active totaling 1,141 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG252 G252
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2002-05-14
Interconnection agreement date2005-11-10
Operational date2005-09-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first