Substation Scout

Monroe, MI interconnection queue

11 active projects totaling 5,147 MW in the MISO queue, plus 15 with terminal status (shown grayed).

11active projects
5,147active MW
26total filed
Queue IDProjectkVMWResourceStatus
G867 Not reported n/r 1,563 Nuclear Withdrawn
J4024 Not reported n/r 1,499 Gas Active
J4025 Not reported n/r 1,499 Gas Active
G066 Not reported n/r 800 Other Withdrawn
G133 Not reported n/r 585 Other Withdrawn
E0018 Monroe ERAS 315 432 Battery Active
J3994 Not reported n/r 360 Battery Active
J3845 Not reported 345 250 Battery Active
E0008 FERMI Storage Project 345 248 Battery Active
J1056 Not reported 345 200 Wind Withdrawn
J1940 Not reported 345 200 Solar Withdrawn
J2475 Not reported 120 200 Battery Active
J2486 Not reported 345 200 Solar Active
J3803 Not reported 345 200 Solar Active
G350 Not reported 345 159 Nuclear Operational
J1350 Not reported 345 150 Solar Withdrawn
J1546 Not reported 345 150 Solar Withdrawn
J1969 Not reported 345 150 Solar Withdrawn
J2118 Not reported 138 125 Hybrid Withdrawn
J1449 Not reported 138 100 Solar Withdrawn
J1942 Not reported 120 100 Solar Withdrawn
J2058 Not reported n/r 100 Wind Withdrawn
J2484 Not reported n/r 100 Solar Active
J1951 Not reported 345 50 Battery Withdrawn
J220 Not reported 138 45 Solar Withdrawn
J421 Not reported n/r 32 Nuclear Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first