Substation Scout

MISO request J2475

MISO queue ID J2475

Queue request J2475 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW battery project in Monroe County, MI, according to Berkeley Lab’s queue data file. The filing names Toll Rd as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2026.

Queue IDJ2475
Project nameNot reported
Status (as published)Active
SubstationToll Rd
Point of interconnectionToll Rd 120kV
CountyMonroe
StateMI
Voltage120 kV
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Monroe, MI: 26 requests in the MISO queue, 11 active totaling 5,147 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC
ClusterDPP-2022 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.