FERMI Storage Project (E0008) was listed in the MISO interconnection queue at the end of 2025 as a 248 MW battery project in Monroe County, MI, according to Berkeley Lab’s queue data file. The filing names Enrico-Brownstown as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 2, 2028.

Queue IDE0008
Project nameFERMI Storage Project
Status (as published)Active
SubstationEnrico-Brownstown
Point of interconnectionEnrico-Brownstown 345kV
CountyMonroe
StateMI
Voltage345 kV
Capacity248 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-06-02
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Monroe, MI: 26 requests in the MISO queue, 11 active totaling 5,147 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDTE Electric
DeveloperDTE Electric
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Active; Post GIA Status: Not started
Queue date2025-08-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first