Mcleod, MN interconnection queue

3 active projects totaling 282.2 MW in the MISO queue, plus 6 with terminal status (shown grayed).

3active projects
282.2active MW
9total filed
Queue IDProjectkVMWResourceStatus
J3934 Not reported 230 250 Solar Withdrawn
H072 Not reported 115 200 Wind Withdrawn
G267 Not reported n/r 190 Gas Withdrawn
J4059 Not reported 230 129 Solar Active
J4060 Not reported 230 129 Battery Withdrawn
J3552 Not reported 115 112 Solar Active
J021 Not reported n/r 41.2 Other Operational
H063 Not reported 69 40 Wind Withdrawn
G400 Not reported n/r 5 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.