Queue request J021 was listed in the MISO interconnection queue at the end of 2025 as a 41.2 MW project in Mcleod County, MN, according to Berkeley Lab’s queue data file. The filing names 305 11th St. E. & Armstrongs Ave. N. as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 31, 2013.

Queue IDJ021
Project nameNot reported
Status (as published)Operational
Substation305 11th St. E. & Armstrongs Ave. N.
Point of interconnection305 11th St. E. & 1019 Armstrongs Ave. N.
CountyMcleod
StateMN
VoltageNot reported
Capacity41.2 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Proposed online date2013-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mcleod, MN: 9 requests in the MISO queue, 3 active totaling 282.2 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2009-JUL MN
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2009-01-05
Interconnection agreement date2010-04-29
Operational date2013-12-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first