Mcdonough, IL interconnection queue
4 active projects totaling 565.6 MW in the MISO queue, plus 5 with terminal status (shown grayed).
4active projects
565.6active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| H003 | Not reported | 138 | 200 | Wind | Withdrawn |
| J1701 | Not reported | 138 | 200 | Wind | Active |
| J3493 | Not reported | n/r | 200 | Wind | Active |
| J3851 | Not reported | n/r | 200 | Battery | Withdrawn |
| J456 | Not reported | 138 | 150 | Wind | Operational |
| J3489 | Not reported | n/r | 105 | Solar | Withdrawn |
| J2172 | Not reported | n/r | 100 | Hybrid | Withdrawn |
| J1243 | Not reported | 69 | 25 | Solar | Withdrawn |
| J2189 | Not reported | n/r | 15.6 | Wind | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.