Mcdonough, IL interconnection queue

4 active projects totaling 565.6 MW in the MISO queue, plus 5 with terminal status (shown grayed).

4active projects
565.6active MW
9total filed
Queue IDProjectkVMWResourceStatus
H003 Not reported 138 200 Wind Withdrawn
J1701 Not reported 138 200 Wind Active
J3493 Not reported n/r 200 Wind Active
J3851 Not reported n/r 200 Battery Withdrawn
J456 Not reported 138 150 Wind Operational
J3489 Not reported n/r 105 Solar Withdrawn
J2172 Not reported n/r 100 Hybrid Withdrawn
J1243 Not reported 69 25 Solar Withdrawn
J2189 Not reported n/r 15.6 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first