Marion, IN interconnection queue

4 active projects totaling 489 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4active projects
489active MW
8total filed
Queue IDProjectkVMWResourceStatus
J1491 Not reported 138 200 Battery Withdrawn
G025 Not reported n/r 189 Gas Operational
J2473 Not reported 138 150 Battery Active
J2343 Not reported 138 130 Battery Active
J2032 Not reported n/r 70 Battery Withdrawn
J1601 Not reported 345 50 Battery Withdrawn
J3709 Not reported n/r 47 Battery Withdrawn
J401 Not reported n/r 20 Battery Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.