MISO request J2473

MISO queue ID J2473

Queue request J2473 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW battery project in Marion County, IN, according to Berkeley Lab’s queue data file. The filing names Hanna as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2026.

Queue IDJ2473
Project nameNot reported
Status (as published)Active
SubstationHanna
Point of interconnectionHanna 138kV
CountyMarion
StateIN
Voltage138 kV
Capacity150 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hanna substation: 2 requests in the MISO queue, 1 active totaling 150 MW.

Queue IDProjectMWResourceStatus
J2032Not reported70BatteryWithdrawn

Marion, IN: 8 requests in the MISO queue, 4 active totaling 489 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityINDIANAPOLIS POWER & LIGHT COMPANY
ClusterDPP-2022 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.