MISO request J401
MISO queue ID J401
Queue request J401 was listed in the MISO interconnection queue at the end of 2025 as a 20 MW battery project in Marion County, IN, according to Berkeley Lab’s queue data file. The filing names Stout South Substation 138 as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of January 15, 2016.
| Queue ID | J401 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Stout South Substation 138 |
| Point of interconnection | Stout South Substation 138 |
| County | Marion |
| State | IN |
| Voltage | Not reported |
| Capacity | 20 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2016-01-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Marion, IN: 8 requests in the MISO queue, 4 active totaling 489 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Cluster | DPP-2015-FEB Central |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | DPP - SIS |
| Queue date | 2014-11-10 |
| Interconnection agreement date | 2016-03-19 |
| Operational date | 2016-01-15 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.