Marathon, WI interconnection queue

4 active projects totaling 918.8 MW in the MISO queue, plus 10 with terminal status (shown grayed).

4active projects
918.8active MW
14total filed
Queue IDProjectkVMWResourceStatus
G144 Not reported 345 550 Coal Operational
G523 Not reported n/r 550 Coal Withdrawn
J1085 Not reported 345 300 Wind Withdrawn
J1121 Not reported 345 200 Solar Withdrawn
J4069 Not reported 115 169.9 Solar Active
J2345 Not reported 345 150 Wind Withdrawn
J3469 Not reported 115 100 Wind Active
J821 Not reported 115 99.9 Wind Withdrawn
G420 Not reported 115 99 Wind Withdrawn
J1508 Not reported 115 98.9 Wind Active
G112 Not reported n/r 85 Other Withdrawn
J040 Not reported 115 50 Other Withdrawn
J2439 Not reported 345 50 Battery Withdrawn
G321 Not reported n/r 7 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.