MISO request J4069

MISO queue ID J4069

Queue request J4069 was listed in the MISO interconnection queue at the end of 2025 as a 169.9 MW solar project in Marathon County, WI, according to Berkeley Lab’s queue data file. The filing names Kelly - Ackley as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 31, 2030.

Queue IDJ4069
Project nameNot reported
Status (as published)Active
SubstationKelly - Ackley
Point of interconnectionKelly - Ackley 115.0kV
CountyMarathon
StateWI
Voltage115 kV
Capacity169.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2030-01-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Marathon, WI: 14 requests in the MISO queue, 4 active totaling 918.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMERICAN TRANSMISSION COMPANY
ClusterDPP Cycle Pending East (ATC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-10-03

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.