MISO request G144

MISO queue ID G144

Queue request G144 was listed in the MISO interconnection queue at the end of 2025 as a 550 MW coal project in Marathon County, WI, according to Berkeley Lab’s queue data file. The filing names WPS Weston Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of March 1, 2004.

Queue IDG144
Project nameNot reported
Status (as published)Operational
SubstationWPS Weston Substation
Point of interconnectionWPS Weston 345 kV Substation
CountyMarathon
StateWI
Voltage345 kV
Capacity550 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2004-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Marathon, WI: 14 requests in the MISO queue, 4 active totaling 918.8 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2001-10-23
Interconnection agreement date2004-01-08
Operational date2004-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.