Substation Scout

Lincoln, MN interconnection queue

13 active projects totaling 1,130 MW in the MISO queue, plus 13 with terminal status (shown grayed).

13active projects
1,130active MW
26total filed
Queue IDProjectkVMWResourceStatus
H041 Not reported 115 400 Wind Withdrawn
G738 Not reported n/r 300 Wind Withdrawn
J3961 Not reported n/r 245 Solar Active
G349 Not reported n/r 200 Wind Operational
J460 Not reported 345 200 Wind Operational
J587 Not reported 345 200 Wind Operational
J943 Not reported 345 200 Wind Withdrawn
J545 Not reported 115 110 Wind Operational
G176 Not reported n/r 100 Wind Operational
J575 Not reported 345 100 Wind Withdrawn
J958 Not reported 115 100 Wind Withdrawn
J1001 Not reported 115 40 Solar Withdrawn
G586 Not reported 34.5 30 Wind Operational
G005 Not reported n/r 29 Gas Active
G663 Not reported 34.5 20 Wind Withdrawn
G443 Not reported 115 7 Wind Operational
G394 Not reported n/r 6.6 Wind Withdrawn
G603 Not reported 34.5 6.3 Wind Withdrawn
G444 Not reported 115 5 Wind Operational
G395 Not reported n/r 4.9 Wind Withdrawn
G279 Not reported n/r 4 Other Withdrawn
G280 Not reported n/r 4 Other Withdrawn
G402 Not reported n/r 3.3 Wind Withdrawn
G241 Not reported 34.5 2 Wind Operational
G073 Not reported n/r 1 Wind Operational
G340 Not reported 41.6 1 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.