Substation Scout

MISO request G443

MISO queue ID G443

Queue request G443 was listed in the MISO interconnection queue at the end of 2025 as a 7 MW wind project in Lincoln County, MN, according to Berkeley Lab’s queue data file. The filing names Buffalo Ridge as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 1, 2007.

Queue IDG443
Project nameNot reported
Status (as published)Operational
SubstationBuffalo Ridge
Point of interconnectionBuffalo Ridge 115kV
CountyLincoln
StateMN
Voltage115 kV
Capacity7 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2007-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Buffalo Ridge substation: 2 requests in the MISO queue, 2 active totaling 12 MW.

Queue IDProjectMWResourceStatus
G444Not reported5WindOperational

Lincoln, MN: 26 requests in the MISO queue, 13 active totaling 1,130 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG443 G443
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2004-08-23
Interconnection agreement date2005-06-10
Operational date2007-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.