Lee, AR interconnection queue
7 active projects totaling 1,600 MW in the MISO queue, plus 11 with terminal status (shown grayed).
7active projects
1,600active MW
18total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J2088 | Not reported | 500 | 400 | Solar | Active |
| J4088 | Not reported | 500 | 340 | Hybrid | Active |
| J1710 | Not reported | n/r | 300 | Solar | Active |
| J2649 | Not reported | 500 | 250 | Hybrid | Withdrawn |
| J3584 | Not reported | 230 | 215 | Battery | Withdrawn |
| J2787 | Not reported | 230 | 200 | Solar | Withdrawn |
| J368 | Not reported | n/r | 200 | Solar | Withdrawn |
| J380 | Not reported | n/r | 198.9 | Solar | Withdrawn |
| J2237 | Not reported | 230 | 185 | Solar | Active |
| J2437 | Not reported | 230 | 175 | Wind | Active |
| J3579 | Not reported | 115 | 135 | Solar | Withdrawn |
| J3790 | Not reported | 115 | 120 | Solar | Withdrawn |
| J1820 | Not reported | 500 | 100 | Solar | Active |
| J2517 | Not reported | 230 | 100 | Battery | Withdrawn |
| J552 | Not reported | 115 | 100 | Solar | Active |
| J379 | Not reported | 115 | 79.1 | Solar | Withdrawn |
| J2217 | Not reported | 230 | 50 | Battery | Withdrawn |
| J1293 | Not reported | 115 | 25 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.