Lee, AR interconnection queue

7 active projects totaling 1,600 MW in the MISO queue, plus 11 with terminal status (shown grayed).

7active projects
1,600active MW
18total filed
Queue IDProjectkVMWResourceStatus
J2088 Not reported 500 400 Solar Active
J4088 Not reported 500 340 Hybrid Active
J1710 Not reported n/r 300 Solar Active
J2649 Not reported 500 250 Hybrid Withdrawn
J3584 Not reported 230 215 Battery Withdrawn
J2787 Not reported 230 200 Solar Withdrawn
J368 Not reported n/r 200 Solar Withdrawn
J380 Not reported n/r 198.9 Solar Withdrawn
J2237 Not reported 230 185 Solar Active
J2437 Not reported 230 175 Wind Active
J3579 Not reported 115 135 Solar Withdrawn
J3790 Not reported 115 120 Solar Withdrawn
J1820 Not reported 500 100 Solar Active
J2517 Not reported 230 100 Battery Withdrawn
J552 Not reported 115 100 Solar Active
J379 Not reported 115 79.1 Solar Withdrawn
J2217 Not reported 230 50 Battery Withdrawn
J1293 Not reported 115 25 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.