Queue request J4088 was listed in the MISO interconnection queue at the end of 2025 as a 340 MW hybrid project in Lee County, AR, according to Berkeley Lab’s queue data file. The filing names Wheatley Switching Station (being built by J1710 & J1820) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2028.

Queue IDJ4088
Project nameNot reported
Status (as published)Active
SubstationWheatley Switching Station (being built by J1710 & J1820)
Point of interconnectionWheatley 500 kV Switching Station (being built by J1710 & J1820)
CountyLee
StateAR
Voltage500 kV
Capacity340 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lee, AR: 18 requests in the MISO queue, 7 active totaling 1,600 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS
ClusterDPP Cycle Pending South
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-10-06
Components (hybrid)Solar 340 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first