Queue request J2088 was listed in the MISO interconnection queue at the end of 2025 as a 400 MW solar project in Lee County, AR, according to Berkeley Lab’s queue data file. The filing names WEST MEMPHIS EHV - KEO EHV (854.0) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 31, 2027.

Queue IDJ2088
Project nameNot reported
Status (as published)Active
SubstationWEST MEMPHIS EHV - KEO EHV (854.0)
Point of interconnectionWEST MEMPHIS EHV - KEO EHV 500 kV (854.0)
CountyLee
StateAR
Voltage500 kV
Capacity400 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-10-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lee, AR: 18 requests in the MISO queue, 7 active totaling 1,600 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS
ClusterDPP-2021 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2022-07-13
Interconnection agreement date2025-12-08

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first