Substation Scout

Jefferson Davis Parish, LA interconnection queue

9 active projects totaling 1,640 MW in the MISO queue, plus 11 with terminal status (shown grayed).

9active projects
1,640active MW
20total filed
Queue IDProjectkVMWResourceStatus
J4076 Not reported 500 400 Battery Active
J3322 Not reported 500 325 Solar Withdrawn
J4050 Not reported 500 220 Solar Active
J4051 Not reported 500 220 Solar Active
J2967 Not reported 138 200 Solar Active
J860 Not reported 138 200 Wind Withdrawn
J1669 Not reported n/r 165 Solar Active
J2968 Not reported 138 165 Solar Withdrawn
S1050 Surplus; J1669 38 165 Hybrid Withdrawn
J1165 Not reported 138 150 Solar Withdrawn
J3781 Not reported 138 150 Solar Active
J672 Not reported n/r 150 Wind Withdrawn
J2202 Not reported 69 100 Battery Withdrawn
J2701 Not reported n/r 100 Solar Active
J3594 Not reported 69 100 Solar Withdrawn
J4052 Not reported 500 100 Battery Active
J3914 Not reported n/r 85 Solar Active
J716 Not reported n/r 60 Solar Withdrawn
J633 Not reported n/r 50 Solar Withdrawn
J693 Not reported n/r 16.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first