MISO request J2701

MISO queue ID J2701

Queue request J2701 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW solar project in Jefferson Davis Parish, LA, according to Berkeley Lab’s queue data file. The filing names COLONIAL WELSH 138 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 15, 2027.

Queue IDJ2701
Project nameNot reported
Status (as published)Active
SubstationCOLONIAL WELSH 138
Point of interconnectionCOLONIAL WELSH 138
CountyJefferson Davis Parish
StateLA
VoltageNot reported
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-04-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Jefferson Davis Parish, LA: 20 requests in the MISO queue, 9 active totaling 1,640 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2022 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.