Howard, IA interconnection queue

5 active projects totaling 540 MW in the MISO queue, plus 11 with terminal status (shown grayed).

5active projects
540active MW
16total filed
Queue IDProjectkVMWResourceStatus
J1413 Not reported 345 300 Solar Withdrawn
G445 Not reported n/r 200 Wind Withdrawn
G771 Not reported 345 200 Wind Withdrawn
J1979 Not reported 345 200 Wind Withdrawn
J030 Not reported n/r 198 Wind Withdrawn
J3898 Not reported 345 155 Wind Active
G716 Not reported 345 150 Wind Withdrawn
G740 Not reported 345 150 Wind Withdrawn
J2466 Not reported 345 130 Wind Withdrawn
J1769 Not reported 161 120 Wind Active
J029 Not reported n/r 102 Wind Withdrawn
G970 Not reported 345 100 Wind Withdrawn
J898 Not reported 161 100 Wind Active
G551 Not reported 161 99 Wind Operational
G715 Not reported 115 76 Wind Withdrawn
J614 Not reported 161 66 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.