Howard, IA interconnection queue
5 active projects totaling 540 MW in the MISO queue, plus 11 with terminal status (shown grayed).
5active projects
540active MW
16total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1413 | Not reported | 345 | 300 | Solar | Withdrawn |
| G445 | Not reported | n/r | 200 | Wind | Withdrawn |
| G771 | Not reported | 345 | 200 | Wind | Withdrawn |
| J1979 | Not reported | 345 | 200 | Wind | Withdrawn |
| J030 | Not reported | n/r | 198 | Wind | Withdrawn |
| J3898 | Not reported | 345 | 155 | Wind | Active |
| G716 | Not reported | 345 | 150 | Wind | Withdrawn |
| G740 | Not reported | 345 | 150 | Wind | Withdrawn |
| J2466 | Not reported | 345 | 130 | Wind | Withdrawn |
| J1769 | Not reported | 161 | 120 | Wind | Active |
| J029 | Not reported | n/r | 102 | Wind | Withdrawn |
| G970 | Not reported | 345 | 100 | Wind | Withdrawn |
| J898 | Not reported | 161 | 100 | Wind | Active |
| G551 | Not reported | 161 | 99 | Wind | Operational |
| G715 | Not reported | 115 | 76 | Wind | Withdrawn |
| J614 | Not reported | 161 | 66 | Wind | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner