Substation Scout

MISO request J898

MISO queue ID J898

Queue request J898 was listed in the MISO interconnection queue at the end of 2025 as a 100 MW wind project in Howard County, IA, according to Berkeley Lab’s queue data file. The filing names Rice - Beaver Creek line tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 30, 2023.

Queue IDJ898
Project nameNot reported
Status (as published)Active
SubstationRice - Beaver Creek line tap
Point of interconnectionRice - Beaver Creek 161kV line tap
CountyHoward
StateIA
Voltage161 kV
Capacity100 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2023-11-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Howard, IA: 16 requests in the MISO queue, 5 active totaling 540 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDAIRYLAND POWER COOPERATIVE
ClusterDPP-2017-AUG West
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Under Construction
Queue date2017-06-16
Interconnection agreement date2021-09-26

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first