MISO request J614
MISO queue ID J614
Queue request J614 was listed in the MISO interconnection queue at the end of 2025 as a 66 MW wind project in Howard County, IA, according to Berkeley Lab’s queue data file. The filing names Rice Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of December 17, 2018.
| Queue ID | J614 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Rice Substation |
| Point of interconnection | Rice 161kV Substation |
| County | Howard |
| State | IA |
| Voltage | 161 kV |
| Capacity | 66 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2018-12-17 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Howard, IA: 16 requests in the MISO queue, 5 active totaling 540 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Cluster | DPP-2016-AUG West |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | GIA |
| Queue date | 2016-05-09 |
| Interconnection agreement date | 2020-02-14 |
| Operational date | 2018-12-17 |