Substation Scout

MISO request J1203

MISO queue ID J1203

Queue request J1203 was listed in the MISO interconnection queue at the end of 2025 as a 125 MW solar project in Genesee County, MI, according to Berkeley Lab’s queue data file. The filing names Thetford Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 15, 2025.

Queue IDJ1203
Project nameNot reported
Status (as published)Active
SubstationThetford Substation
Point of interconnectionThetford 345kV Substation
CountyGenesee
StateMI
Voltage345 kV
Capacity125 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2025-05-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Genesee, MI: 12 requests in the MISO queue, 6 active totaling 1,892.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2019 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA Complete; Post GIA Status: Under Construction
Queue date2019-04-25
Interconnection agreement date2022-08-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first