Substation Scout

Fond Du Lac, WI interconnection queue

6 active projects totaling 951 MW in the MISO queue, plus 8 with terminal status (shown grayed).

6active projects
951active MW
14total filed
Queue IDProjectkVMWResourceStatus
G048 Not reported n/r 725 Other Withdrawn
J4115 Not reported 345 525 Gas Active
G335 Not reported 345 160 Wind Withdrawn
J1253 Not reported 345 100 Solar Withdrawn
J1716 Not reported 345 100 Solar Withdrawn
J3160 Not reported 345 100 Battery Active
J146 Not reported 138 99 Wind Withdrawn
G427 Not reported 345 98 Wind Withdrawn
G507b Not reported 138 98 Wind Operational
J1994 Not reported 138 97.1 Solar Withdrawn
G353 Not reported 345 80 Wind Operational
G354 Not reported 345 80 Wind Operational
G507 Not reported 138 68 Wind Operational
J2834 Not reported 69 50 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first