MISO request G507b

MISO queue ID G507b

Queue request G507b was listed in the MISO interconnection queue at the end of 2025 as a 98 MW wind project in Fond Du Lac County, WI, according to Berkeley Lab’s queue data file. The filing names Ohmstead - Kettle Moraine as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 1, 2008.

Queue IDG507b
Project nameNot reported
Status (as published)Operational
SubstationOhmstead - Kettle Moraine
Point of interconnectionOhmstead - Kettle Moraine 138kV
CountyFond Du Lac
StateWI
Voltage138 kV
Capacity98 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2008-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Fond Du Lac, WI: 14 requests in the MISO queue, 6 active totaling 951 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2006-03-16
Interconnection agreement date2007-05-30
Operational date2008-08-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.