Substation Scout

Edwards, IL interconnection queue

2 active projects totaling 238 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
238active MW
3total filed
Queue IDProjectkVMWResourceStatus
J1579 Not reported 138 200 Solar Withdrawn
J1422 Not reported 138 150 Hybrid Active
J3223 Not reported 138 88 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.