MISO request J1422
MISO queue ID J1422
Queue request J1422 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW hybrid project in Edwards County, IL, according to Berkeley Lab’s queue data file. The filing names Albion - Olney Line Tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 20, 2024.
| Queue ID | J1422 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Albion - Olney Line Tap |
| Point of interconnection | Albion - Olney 138 kV Line Tap |
| County | Edwards |
| State | IL |
| Voltage | 138 kV |
| Capacity | 150 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2024-10-20 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Edwards, IL: 3 requests in the MISO queue, 2 active totaling 238 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Cluster | DPP-2019 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: Not Started |
| Queue date | 2019-04-29 |
| Interconnection agreement date | 2025-12-29 |
| Components (hybrid) | Solar 150 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.