MISO request J3223
MISO queue ID J3223
Queue request J3223 was listed in the MISO interconnection queue at the end of 2025 as a 88 MW hybrid project in Edwards County, IL, according to Berkeley Lab’s queue data file. The filing names Olney (4JASPER ) - Albion (4ALBION N ) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2027.
| Queue ID | J3223 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Olney (4JASPER ) - Albion (4ALBION N ) |
| Point of interconnection | Olney (4JASPER 347868) - Albion (4ALBION N 346510) 138 kV |
| County | Edwards |
| State | IL |
| Voltage | 138 kV |
| Capacity | 88 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2027-03-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Edwards, IL: 3 requests in the MISO queue, 2 active totaling 238 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Cluster | DPP-2022 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Study Phase: DPP 2; Post GIA Status: Not Started |
| Queue date | 2022-09-15 |
| Components (hybrid) | Solar 88 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.