MISO request J3223

MISO queue ID J3223

Queue request J3223 was listed in the MISO interconnection queue at the end of 2025 as a 88 MW hybrid project in Edwards County, IL, according to Berkeley Lab’s queue data file. The filing names Olney (4JASPER ) - Albion (4ALBION N ) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2027.

Queue IDJ3223
Project nameNot reported
Status (as published)Active
SubstationOlney (4JASPER ) - Albion (4ALBION N )
Point of interconnectionOlney (4JASPER 347868) - Albion (4ALBION N 346510) 138 kV
CountyEdwards
StateIL
Voltage138 kV
Capacity88 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Edwards, IL: 3 requests in the MISO queue, 2 active totaling 238 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP-2022 Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15
Components (hybrid)Solar 88 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first