MISO request J554

MISO queue ID J554

Queue request J554 was listed in the MISO interconnection queue at the end of 2025 as a 1 MW solar project in Dodge County, MN, according to Berkeley Lab’s queue data file. The filing names Kasson - Dodge Center as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2016.

Queue IDJ554
Project nameNot reported
Status (as published)Operational
SubstationKasson - Dodge Center
Point of interconnectionKasson - Dodge Center 69 kV
CountyDodge
StateMN
Voltage69 kV
Capacity1 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2016-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Kasson - Dodge Center substation: 2 requests in the MISO queue, 1 active totaling 1 MW.

Queue IDProjectMWResourceStatus
G239Not reported63WindWithdrawn

Dodge, MN: 11 requests in the MISO queue, 3 active totaling 34 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2016-03-28
Interconnection agreement date2017-03-06
Operational date2016-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.