Substation Scout

MISO request J249

MISO queue ID J249

Queue request J249 was listed in the MISO interconnection queue at the end of 2025 as a 180 MW wind project in Dickey County, ND, according to Berkeley Lab’s queue data file. The filing names MDU Tatanka Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2012.

Queue IDJ249
Project nameNot reported
Status (as published)Operational
SubstationMDU Tatanka Substation
Point of interconnectionMDU Tatanka Substation
CountyDickey
StateND
VoltageNot reported
Capacity180 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2012-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dickey, ND: 21 requests in the MISO queue, 5 active totaling 960 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2012-AUG West
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2012-07-02
Interconnection agreement date2013-12-12
Operational date2012-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.