Dewitt, IL interconnection queue

3 active projects totaling 371 MW in the MISO queue, plus 5 with terminal status (shown grayed).

3active projects
371active MW
8total filed
Queue IDProjectkVMWResourceStatus
G925 Not reported 345 300 Wind Withdrawn
J1840 Not reported 345 250 Solar Active
J273 Not reported 138 149.6 Wind Withdrawn
J474 Not reported 138 144 Wind Withdrawn
J3358 Not reported n/r 100 Battery Withdrawn
J4158 Not reported 138 100 Solar Active
J1080 Not reported 345 99 Wind Withdrawn
J4010 Not reported 345 21 Nuclear Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.