MISO request J1840
MISO queue ID J1840
Queue request J1840 was listed in the MISO interconnection queue at the end of 2025 as a 250 MW solar project in Dewitt County, IL, according to Berkeley Lab’s queue data file. The filing names Clinton to Goose Creek- line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 30, 2023.
| Queue ID | J1840 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Clinton to Goose Creek- line |
| Point of interconnection | Clinton to Goose Creek-4545 345kV line |
| County | Dewitt |
| State | IL |
| Voltage | 345 kV |
| Capacity | 250 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2023-08-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Dewitt, IL: 8 requests in the MISO queue, 3 active totaling 371 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Cluster | DPP-2020 Central |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | Study Phase: GIA In Process; Post GIA Status: Not Started |
| Queue date | 2020-06-25 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.