Substation Scout

MISO request J4010

MISO queue ID J4010

Queue request J4010 was listed in the MISO interconnection queue at the end of 2025 as a 21 MW nuclear project in Dewitt County, IL, according to Berkeley Lab’s queue data file. The filing names Clinton Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2027.

Queue IDJ4010
Project nameNot reported
Status (as published)Active
SubstationClinton Substation
Point of interconnectionClinton 345kV Substation
CountyDewitt
StateIL
Voltage345 kV
Capacity21 MW
Resource (as published)Nuclear
Resource categoryNuclear (normalized for filtering)
Proposed online date2027-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dewitt, IL: 8 requests in the MISO queue, 3 active totaling 371 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
ClusterDPP Cycle Pending Central
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-04-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first