Substation Scout

MISO request J2091

MISO queue ID J2091

Queue request J2091 was listed in the MISO interconnection queue at the end of 2025 as a 250 MW battery project in Desoto County, MS, according to Berkeley Lab’s queue data file. The filing names TWINKLETOWN as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 22, 2025.

Queue IDJ2091
Project nameNot reported
Status (as published)Active
SubstationTWINKLETOWN
Point of interconnectionTWINKLETOWN 230 KV
CountyDesoto
StateMS
Voltage230 kV
Capacity250 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2025-02-22
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Desoto, MS: 8 requests in the MISO queue, 6 active totaling 1,904 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY MISSISSIPPI, LLC.
ClusterDPP-2021 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2022-01-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first