De Soto Parish, LA interconnection queue

3 active projects totaling 1,185 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3active projects
1,185active MW
6total filed
Queue IDProjectkVMWResourceStatus
J4133 Not reported n/r 756 Gas Active
R1004 Replace 330 MW of CLECO.DPS Unit with solar; Dolet Hills 345 330 Hybrid Active
J3180 Not reported n/r 110 Solar Withdrawn
J2208 Not reported 138 99 Solar Active
J2411 Not reported 138 80 Solar Withdrawn
J3178 Not reported n/r 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.