Replace 330 MW of CLECO.DPS Unit with solar; Dolet Hills

MISO queue ID R1004

Replace 330 MW of CLECO.DPS Unit with solar; Dolet Hills (R1004) was listed in the MISO interconnection queue at the end of 2025 as a 330 MW hybrid project in De Soto Parish, LA, according to Berkeley Lab’s queue data file. The filing names Dolet Hills (Bus #) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2024.

Queue IDR1004
Project nameReplace 330 MW of CLECO.DPS Unit with solar; Dolet Hills
Status (as published)Active
SubstationDolet Hills (Bus #)
Point of interconnectionDolet Hills 345 kV (Bus #500260)
CountyDe Soto Parish
StateLA
Voltage345 kV
Capacity330 MW
Resource (as published)Solar+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2024-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

De Soto Parish, LA: 6 requests in the MISO queue, 3 active totaling 1,185 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityCLECO POWER
Interconnection serviceNRIS
Project typeGeneration
Queue date2020-12-30
Components (hybrid)Solar 330 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.