MISO request J2208
MISO queue ID J2208
Queue request J2208 was listed in the MISO interconnection queue at the end of 2025 as a 99 MW solar project in De Soto Parish, LA, according to Berkeley Lab’s queue data file. The filing names Mansfield (Bus #) to Red River Tap (Bus #) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 4, 2024.
| Queue ID | J2208 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Mansfield (Bus #) to Red River Tap (Bus #) |
| Point of interconnection | Mansfield (Bus #500530) to Red River Tap (Bus #500762) 138 kV |
| County | De Soto Parish |
| State | LA |
| Voltage | 138 kV |
| Capacity | 99 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2024-10-04 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
De Soto Parish, LA: 6 requests in the MISO queue, 3 active totaling 1,185 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | CLECO POWER |
|---|---|
| Cluster | DPP-2021 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | Study Phase: GIA In Process; Post GIA Status: Not Started |
| Queue date | 2021-08-27 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.