Cook, MN interconnection queue

2 active projects totaling 36 MW in the MISO queue.

2active projects
36active MW
2total filed
Queue IDProjectkVMWResourceStatus
G641 Not reported n/r 18 Other Operational
J2116 Not reported n/r 18 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.