MISO request J2116

MISO queue ID J2116

Queue request J2116 was listed in the MISO interconnection queue at the end of 2025 as a 18 MW project in Cook County, MN, according to Berkeley Lab’s queue data file. The filing names COVIL as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2022.

Queue IDJ2116
Project nameNot reported
Status (as published)Active
SubstationCOVIL
Point of interconnectionCOVIL
CountyCook
StateMN
VoltageNot reported
Capacity18 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Proposed online date2022-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cook, MN: 2 requests in the MISO queue, 2 active totaling 36 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityGREAT RIVER ENERGY
ClusterDPP-2021 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 3; Post GIA Status: Not Started
Queue date2023-12-08

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.