MISO request G641

MISO queue ID G641

Queue request G641 was listed in the MISO interconnection queue at the end of 2025 as a 18 MW project in Cook County, MN, according to Berkeley Lab’s queue data file. The filing names Colville Sub as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 1, 2008.

Queue IDG641
Project nameNot reported
Status (as published)Operational
SubstationColville Sub
Point of interconnectionColville Sub
CountyCook
StateMN
VoltageNot reported
Capacity18 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Proposed online date2008-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cook, MN: 2 requests in the MISO queue, 2 active totaling 36 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)SPA - SIS
Queue date2006-05-24
Interconnection agreement date2008-10-01
Operational date2008-10-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.