Boone, IN interconnection queue

2 active projects totaling 510 MW in the MISO queue, plus 5 with terminal status (shown grayed).

2active projects
510active MW
7total filed
Queue IDProjectkVMWResourceStatus
E0021 Brickyard Energy Storage 345 310 Battery Active
J1682 Not reported 345 300 Solar Withdrawn
J3383 Not reported 345 300 Solar Withdrawn
H015 Not reported 345 200 Wind Withdrawn
H027 Not reported 345 200 Wind Withdrawn
J053 Not reported 345 200 Wind Withdrawn
J993 Not reported 345 200 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.