Brickyard Energy Storage
MISO queue ID E0021
Brickyard Energy Storage (E0021) was listed in the MISO interconnection queue at the end of 2025 as a 310 MW battery project in Boone County, IN, according to Berkeley Lab’s queue data file. The filing names Hortonville-Whitestown as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 25, 2028.
| Queue ID | E0021 |
|---|---|
| Project name | Brickyard Energy Storage |
| Status (as published) | Active |
| Substation | Hortonville-Whitestown |
| Point of interconnection | Hortonville-Whitestown 345kV |
| County | Boone |
| State | IN |
| Voltage | 345 kV |
| Capacity | 310 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2028-02-25 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Boone, IN: 7 requests in the MISO queue, 2 active totaling 510 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AES Indiana |
|---|---|
| Developer | Brickyard Energy Storge, LLC |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Request Status: Active; Post GIA Status: Not started |
| Queue date | 2025-08-06 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.