Boone, IA interconnection queue
2 active projects
totaling 565 MW in the MISO queue, plus 4 with terminal status (shown grayed).
2 active projects
565 active MW
6 total filed
Queue ID Project kV MW Resource Status
J498
Not reported
345
340
Wind
Operational
J1050
Not reported
161
225
Wind
Operational
J691
Not reported
n/r
160
Wind
Withdrawn
H097
Not reported
161
120.6
Wind
Withdrawn
G813
Not reported
n/r
100
Wind
Withdrawn
J3555
Not reported
n/r
84
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.