MISO request J1050

MISO queue ID J1050

Queue request J1050 was listed in the MISO interconnection queue at the end of 2025 as a 225 MW wind project in Boone County, IA, according to Berkeley Lab’s queue data file. The filing names Doud Tap Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of July 1, 2022.

Queue IDJ1050
Project nameNot reported
Status (as published)Operational
SubstationDoud Tap Substation
Point of interconnectionDoud Tap 161 kV Substation
CountyBoone
StateIA
Voltage161 kV
Capacity225 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2022-07-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Boone, IA: 6 requests in the MISO queue, 2 active totaling 565 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC MIDWEST
ClusterDPP-2018-APR West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2018-03-12
Interconnection agreement date2022-01-17
Operational date2022-07-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.