MISO request J498
MISO queue ID J498
Queue request J498 was listed in the MISO interconnection queue at the end of 2025 as a 340 MW wind project in Boone County, IA, according to Berkeley Lab’s queue data file. The filing names MEC Grimes-Lehigh line (18 miles south of Leigh substation) as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of January 31, 2017.
| Queue ID | J498 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | MEC Grimes-Lehigh line (18 miles south of Leigh substation) |
| Point of interconnection | MEC 345 kV Grimes-Lehigh line (18 miles south of Leigh substation) |
| County | Boone |
| State | IA |
| Voltage | 345 kV |
| Capacity | 340 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Proposed online date | 2017-01-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Boone, IA: 6 requests in the MISO queue, 2 active totaling 565 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Cluster | DPP-2016-FEB West |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | GIA |
| Queue date | 2015-11-13 |
| Interconnection agreement date | 2019-02-08 |
| Operational date | 2017-01-31 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.